Joining Corzan Pipe and Fittings - Solvent Cementing
-
Recommended Set Times
After a joint is assembled using solvent cement, it should not
be disturbed for a period of time to allow for proper "setting" of the newly
prepared joint. Recommended set times are as follows
|
|
-
Recommended Cure Times
After a joint is assembled using solvent cement, the cement
must be allowed to properly "cure" before the piping system is pressurized.
Recommended minimum cure times are shown below. These recommendations should
only serve as a guide since atmospheric conditions during installation will
affect the curing process.
High humidity and/or colder
weather will require longer cure times: typically add 50% to the recommended
cure time if surroundings are humid or damp.
|