IMPORTANT NOTES

Horizontal & Vertical runs of Astral Flow Guard Pipe should be supported by pipe clamps or by hangers located on the horizontal connection close to the riser hangers should not have rough or sharp edges, which come in contact with the pipe.


Horizontal and Vertical Support
Spacing
Nominal Pipe Size 21°C
(70°F)
49°C
(120°F)
71°C
(160°F)
82°C
(180°F)
(In) (mm) (FT) (cm) FT (cm) FT (cm) FT (cm)
1/2 (15) 5.5 (167.7) 4.5 (137.16) 3.0 (91.44) 2.5 (76.2)
3/4 (20) 5.5 (167.7) 5.0 (152.4) 3.0 (91.44) 2.5 (76.2)
1 (25) 6.0 (182.88) 5.5 (167.7) 3.5 (106.68) 3.5 (91.44)
1 1/4 (32) 6.5 (198.12) 6.0 (182.88) 3.5 (106.68) 3.5 (106.68)
1 1/2 (40) 7.0 (213.36) 6.0 (182.88) 3.5 (106.68) 3.5 (106.68)
2 (50) 7.0 (213.36) 6.5 (198.12) 4.0 (121.92) 3.5 (106.68)